Thomas Riverfront Development | Brownfields Remediation

Location: Thomas, Tucker County, WV

Date: Survey- Phase 1: 2012 phase II: 2017, Design 2014

In collaboration with Downstream Strategies, Green Rivers conducted Phase I and Phase II environmental surveys of the site. Phase I was conducted in 2012 where extensive environmental assessments and historic record searches were preformed. After assessment, Green Rivers is proud to have designed a grand river crossing, additional parking, and a visually appealing park with ADA compliant features. Designs also included restoring the streambank and development of the trailhead. A Phase II survey was conducted in 2017 to further access historical and environmental impacts to the site. Ten groundwater wells were installed and further monitored.

State map with starred project location
Design of park

DESIGN | Conceptual map

A section of Cobun Creek and planned site of connecting bridge.

SURVEY | The site chosen for bridge crossing designs.

SURVEY | Phase II survey

SURVEY | Historical structures were properly cataloged.